
The technological information office at Bilbao Airport
Bed4 U Hotel in Pamplona
Pneumatic Waste Collection system in Pamplona’s Historical Quarter
“Reyno de Navarra Arena” Multipurpose Pavilion
Building for the Government of Navarra’s Dept. of the Environment
Industrial building for Xial Domotecnología, S.L.
Sunsundegui
Concrete Plant inside Industrial Building in Olaberria
Museum of the Running of the Bulls and San Fermin
Factory premises for Acciona Blades in Lumbier
Prefabricated residential construction plant
Senda Viva
Agro-alimentary City of Tudela
University Clinic of Navarre
Spanish Pavilion for the Expo 2008
Industrial Kitchen work for Horno Artesano
Head offices of Gamesa Eólica
Headquarters of Acciona Solar in Sarriguren
Water Leisure Centre in Cascante
Miguel Induráin Sports Centre
Señorío de Bértiz Natural Park
Factory premises for Berlys in Tajonar
IEM
Royal and General Archive of Navarre
Civican
Sarriguren Development
Factory premises for Icer Brakes
Mendillorri Development
Polo Park
Paint shop for Volkswagen Navarra S.A.
Computer process simulation for Volkswagen Navarra
Factory premises for Heinz Ibérica in Alfaro (La Rioja)
Arazuri Orcoyen Industrial Area
Pedestrianization of the Old Quarter of Pamplona
Industrial Barranquesa
Factory premises for Gamesa Eólica in Pamplona
Mairaga District Water Treatment Plant
Urban infraestructures of Iraizoz
Prefabricated residential construction plant
Benavente (Portugal) 2009
Design of the plant, factory production process and product of the prefabricated building production plant: hotels, schools and homes.
Due to the requirements of Spain's Building Technical Code (CTE), the prefabricated building floors, ceiling and exterior walls need to be of concrete, in order to comply with acoustic requirements.
The plant comprises 7,700 m2 of constructed space, with a building for the construction of concrete floors and panels and two buildings for the production of 250 to 450 m2 of buildings a day, and a further building for packing and shipping control.